Xinjiang Xinfa is expected to resume production of 500000 tons of electrolytic aluminum on November 15

2019-11-13


It is understood that in August this year, Xinjiang Xinfa electrolytic aluminum plant, which temporarily shut down 500000 tons of production capacity due to the leakage and explosion of the electrolytic cell, is expected to start power on November 15 and resume production, which will be completed by the end of December. The capacity of the plant is 1.9 million tons, and the current operating capacity is 1.3 million tons. (From CCMN)